Real ERCES Results. Real Approvals.

From first grid test to AHJ sign-off—our NICET-certified team delivers code-cleanoutcomes.

Before: 51% Pass After: 100% Pass

AHJ Accepted

Outcomes that matter

51%

100%

Code-Compliant Coverage

Post-install with critical areas ≥ 99%

Met minimum -95 dBm building-wide; witnessed by AHJ.

245+

Retail Rollouts at Scale

Locations validated via passive surveys

Post-site surveys and heatmaps (Meijer)

99%

Process You Can Audit

Grid plans, DAQ ≥ 3.0 thresholds

Alarm/FACP verification, baseline captures

What customers say

MJ

Mike Johnson

Facilities Manager

Plastipak

"Outstanding quality and communication throughout the project. WZC delivered exactly what they promised on time."

Verified Customer

SM

Sarah Martinez

IT Director

Marco Net

"Comprehensive surveys and exceptional ongoing support. Their technical expertise is unmatched in the region."

Verified Customer

DC

David Chen

Operations Manager

Anchor Hocking

"Professional installation team and thorough documentation. The system exceeded our expectations."

Verified Customer

LR

Lisa Rodriguez

Facilities Director

SMART Bus

"Reliable partner for all our communication infrastructure needs. Always responsive and solution-focused."

Verified Customer

JW

James Wilson

Campus Services

Bay College

"Trust WZC completely with our emergency communication systems. Their expertise gives us confidence."

Verified Customer

AF

Amanda Foster

Property Manager

Oakwood Group

"Fast response times and excellent project management. They understand the urgency of compliance deadlines."

Verified Customer

Credentials & compliance

NICET-Certified Team

Professional engineering certification

NFPA / IFC Code Fluency

IFC 510, NFPA 72/1225 expertise

UL 2524 Hardware

Listed equipment requirements

From first test to final sign-off

Grid Test

Listed equipment requirements

Grid tile analysis

Design/BOM

iBwave system design

Riser drawings

AHJ Consult

Authority coordination

Compliance plan

Install/Commission

System deployment

Test reports

Final Testing

AHJ witnessed testing

Acceptance docs

Annual Health Checks

Ongoing maintenance

Health reports

Featured case studies

Clawson Manor Co-Op

ERCES Implementation

Challenge

77 of 152 areas (51%) weak pre-installation

Result

100% of facility meets -95 dBm with 95% general and 99% critical requirements achieved

Read Case Study

Meijer

Multi-site Deployment

Scope

245-site refresh across Michigan locations

Validation

Post-site surveys and heatmaps for comprehensive coverage verification

Read Case Study

Bring your building into compliance

No pricing online—send your plans and we'll scope an AHJ-ready path to acceptance.