Active, Passive, and Hybrid DAS scoped with code-aligned surveys, UL-2524 hardware, isolation verification, and witnessed acceptance.
What you get
AHJ intake: local adoption of IFC 510/NFPA 1225
Required coverage (≥95% general / ≥99% critical)
DAQ threshold (≥3.0)
Test grid density requirements
Hallway/stairwell treatment protocols
Battery hours specification (12–24)
Enclosure NEMA ratings
Alarm points to FACP integration
FCC Part 90 coordination
VHF (150-174 MHz)
UHF (450-470 MHz)
700 MHz (763-775 MHz)
800 MHz (806-824 MHz)
900 MHz (896-901 MHz)
AHJ Approved
Designed and executed like an RF acceptance rehearsal. No pricing shown—scope, rigor, and outcomes only.
Pre-Survey Coordination & Site Readiness

AHJ & Code Review (IFC / NFPA requirements, jurisdiction nuances)

Building Plan Review (architectural drawings, floor plans, stairwells, basements, parking)

Test Plan Development (grid spacing, test areas, pass/fail criteria)

Stakeholder Coordination (property management, security, escorts, access times)
Outcome: Survey day runs tight, efficient, and defensible.
On-Site Grid Testing

NFPA/IFC-Compliant Grid Testing

Signal Metrics Collected
DAQ (Delivered Audio Quality)
RSSI
SINR

Per-Floor & Per-Zone Measurements

Pass/Fail Determination by Area
Outcome: Hard data—not opinions—on whether the building meets code.
Donor Signal & RF Environment Assessment
We don’t just test inside the building—we validate what’s feeding it.

Rooftop / Exterior Donor Signal Testing

Carrier Identification & Signal Strength Validation

Interference & Noise Floor Analysis

Line-of-Sight & Mounting Feasibility Review
Outcome: Confirms whether ERCES is even viable—and what system type is required.
Infrastructure & Pathway Assessment
We survey like installers, not just testers.

BDA Location Feasibility

Equipment Room & Power Availability Review

Grounding & Bonding Conditions

Riser & Pathway Identification

Backbone & Antenna Distribution Feasibility
Outcome: Survey data that actually translates into a buildable system.
Photo & Documentation Capture
Everything is documented like it’s going straight into permitting.

Test Point Photos

Equipment Room & Roof Photos

Pathways, Penetrations & Constraints

Annotated Notes for Design & AHJ Review
Outcome: Zero guesswork later for engineers, installers, or inspectors.
ERCES Survey Report & Deliverables

Formal ERCES Survey Report

Deficiency Identification

System Recommendation

Design Readiness Summary

AHJ-Ready Documentation
Outcome: A report that supports permitting, budgeting, and enforcement.

Vertical riser pathways

Horizontal distribution routes

Penetration details and fire-stops

Equipment room locations

Composite power per band

Noise-rise analysis

Attenuation ladder calculations

UL-2524 BOM specifications

Critical area coverage priority

Elevator/stairwell positioning

Ceiling constraint management

As-built template preparation
Installation Timeline
Cable Installation
Clean practice, torque specs, PIM hygiene
Sweep Testing
Cable performance verification
Equipment Install
BDA/RU mounting and connection
System Integration
FACP integration and testing
Performance Testing
RF validation and optimization
Final Acceptance
AHJ witnessed testing
Witnessed Grid Tests
General Areas
≥95% Coverage
Critical Areas
≥99% Coverage
DAQ Threshold
≥3.0
Deliverables Package
Pass tables with detailed measurements
Coverage heatmaps and analysis
Audio quality recordings
Alarm state verification photos
Baseline captures for annual re-cert
24/7 Network Operations Center

Composite power per band

Noise-rise analysis

Attenuation ladder calculations

UL-2524 BOM specifications
Annual Recertification
Grid Sampling
Per AHJ requirements
Change Management
Tenant build-out impacts
Certification Renewal
Updated compliance documentation
No pricing online—scope only. We return an AHJ-ready plan and budget range after review.