Case study · Hotel / Hospitality
Failing benchmark to first-pass AHJ approval
AC Hotel Ann Arbor, a 7-floor hotel in Ann Arbor, Michigan, failed its public-safety benchmark grid test, legally triggering an ERCES. WZC took it to full code coverage, approved on the first inspection.
- Client:
- AC Hotel Ann Arbor
- Location:
- Ann Arbor, Michigan
- Industry:
- Hotel / Hospitality
- Service:
- Public Safety DAS / ERCES
From failed benchmark to margin above code
- Sq ft covered
- 81,706
- Sq ft covered
- General coverage
- 95%
- General coverage
- Critical-area coverage
- 99%
- Critical-area coverage
- Punchlist items
- 0
- Punchlist items
Acceptance grid-test results at AC Hotel Ann Arbor, 95% general and 99% critical-area coverage across 81,706 sq ft, approved on the first inspection.
The challenge
AC Hotel Ann Arbor failed its public-safety benchmark grid test, and the failure legally triggered an ERCES requirement.
The solution
WZC ran the full process from there: predictive iBwave design and direct fire-marshal coordination, so the system on paper was the system the AHJ expected to see.
Engineered to pass the first inspection
- 01
Benchmark: failed grid test
- 02
Acceptance: first-pass approval
When AC Hotel Ann Arbor failed its public-safety benchmark grid test, the failure legally triggered an ERCES requirement. WZC ran the full process from there: predictive iBwave design and direct fire-marshal coordination, so the system on paper was the system the AHJ expected to see.
The acceptance grid test proved 95% general and 99% critical-area coverage with margin, earning first-pass AHJ approval with zero punchlist items.
- Predictive iBwave design with fire-marshal coordination
- Acceptance grid test passed with margin, zero punchlist
More results
Senior Living
100%grid pass rate at acceptanceERCES coverage from 51% to 100% in four days
A 15-story senior-living high-rise failing public-safety coverage at 51%, brought to full compliance in four days.Read case studyRetail
50+sites deliveredERCES compliance across 50+ store deployments
Turnkey ERCES for new and existing supercenters, grid testing, design, install, AHJ approval, commissioning.Read case studyHealthcare
6coverage sectorsERCES through MRI shielding & Joint Commission compliance
A healthcare facility with MRI shielding challenges brought into Joint Commission and IFC compliance across six sectors.Read case study