ERCES coverage from 51% to 100% in four days

Clawson Manor, a 15-story senior-living co-op in Clawson, Michigan, was failing emergency-responder coverage at 51% on its benchmark grid test. WZC brought the building to 100% passing coverage in four days.

Client:
Clawson Manor
Location:
Clawson, Michigan
Industry:
Senior Living
Service:
Public Safety DAS / ERCES

51% failing to 100% passing, measured on the grid

Coverage at benchmark
51%
Coverage at benchmark
grid pass rate at acceptance
100%
grid pass rate at acceptance
Days to install
4
Days to install
Floors covered
15
Floors covered

Grid-test results at Clawson Manor: a 51% failing benchmark brought to a 100% grid pass rate at acceptance by a four-day passive DAS install.

The challenge

Benchmark grid testing showed the 15-story high-rise failing emergency-responder coverage at just 51%, in the kind of building where first responders cannot afford a dead zone.

The solution

WZC performed the grid testing, then designed a passive DAS in iBwave and coordinated the plan directly with the AHJ. With the design approved, the crew installed the system in four days.

Four days from failing grid test to full compliance

  1. 01

    Benchmark: 51% coverage

  2. 02

    Acceptance: 100% passing

Clawson Manor is a 15-story senior-living co-op in Clawson, Michigan, the kind of building where first responders cannot afford a dead zone. Benchmark grid testing showed the high-rise failing emergency-responder coverage at just 51%.

The result: 100% passing coverage across all 15 floors, four days from first install to acceptance test.

  • On-site grid testing to benchmark real-world coverage
  • Passive DAS designed in iBwave
  • AHJ coordination handled end to end by WZC
  • Installed and passing at 100% in four days